Project

General

Profile

Actions

FluentEdgeTracker #1540

open

Campaign Card – Trophy and Wexl Logo Issues

Added by Naveena G 20 days ago. Updated 20 days ago.

Status:
In Testing
Priority:
P1
Assignee:
Category:
-
Target version:
-
Start date:
09/18/2026
Due date:
% Done:

0%

Estimated time:
Issue Type:
Feature

Description

Please fix the following issues in the Campaign Card:

  1. Trophy Image Issue

    • The trophy image is currently displayed only partially.
    • Please ensure the complete trophy is visible and properly aligned.
  2. Wexl Logo

    • The current Wexl logo needs to be changed.
    • Please replace it with the updated Wexl logo.
  3. Test Card – Date Format

    • The scheduled date displayed on the Test Card has a date format issue.
    • Please update the date format to the expected/standard format and ensure it is displayed consistently.
Actions #1

Updated by Naveena G 20 days ago

  • Status changed from New to Ready for Dev
Actions #2

Updated by Naveena G 20 days ago

  • Description updated (diff)
Actions #3

Updated by Asha Shaik 20 days ago

  • Status changed from Ready for Dev to In Dev
Actions #4

Updated by Asha Shaik 20 days ago

  • Status changed from In Dev to In Testing
Actions

Also available in: Atom PDF