Project

General

Profile

Actions

FluentEdgeTracker #266

closed

Generate Referral Links After Test Completion for Students

Added by Naveena G 2 months ago. Updated about 2 months ago.

Status:
Done
Priority:
P1
Assignee:
Start date:
05/07/2026
Due date:
% Done:

0%

Estimated time:
Issue Type:

Description

Overview

Implement referral link generation and sharing functionality for students after successful test completion.

Description

Once a student completes the test successfully, the system should automatically generate and display a referral link/code that students can share with their friends.

The referral feature should encourage students to invite friends to register and participate in the platform.

Requirements

Referral Access After Test Completion

  • After completing the test:

    • Generate referral link automatically
    • Generate unique referral code
    • Display referral section on result/completion page

Referral Features

Student Actions

Students should be able to:

  • Copy referral link
  • Copy referral code
  • Share referral link with friends

Share Options

Provide sharing support for:

  • WhatsApp

  • Email

Referral Tracking

Track:

  • Total invited friends
  • Successful registrations
  • Referral activity
  • Referral reward eligibility

UI Requirements

Display Referral Section On:

  • Test completion page
  • Results page
  • Student dashboard (optional)

UI Components

  • Referral banner/card
  • Share buttons
  • Copy link button
  • Referral progress tracker

Validation Rules

  • Referral link should generate only after successful test completion
  • Prevent duplicate/self-referrals
  • Each student should have a unique referral code

Expected Output

  • Students receive referral links immediately after completing the test
  • Students can share referral links easily
  • Referral tracking updates dynamically
  • Referral section matches platform UI/UX design

https://docs.google.com/document/d/13mAycL4M2nFYLfsns09eATzB725U7vR3Aq3lRzKbBtg/edit?tab=t.0

Actions #1

Updated by Naveena G 2 months ago

  • Priority changed from P3 to P1
Actions #2

Updated by Naveena G 2 months ago

  • Description updated (diff)
Actions #3

Updated by Naveena G 2 months ago

  • Assignee set to Arunkumar G
Actions #4

Updated by Naveena G 2 months ago

  • Status changed from New to In Dev
Actions #5

Updated by Arunkumar G 2 months ago

  • Status changed from In Dev to In Testing
Actions #6

Updated by Arunkumar G 2 months ago

  • Assignee changed from Arunkumar G to Naveena G
Actions #7

Updated by Naveena G 2 months ago

  • Status changed from In Testing to Ready for Production
Actions #8

Updated by Naveena G about 2 months ago

  • Status changed from Ready for Production to Done
Actions

Also available in: Atom PDF